Check everything before you price. The scope lines, quantities, dollar values and sheet or page references on this page are computer-generated takeoffs and are subject to error. Double-check every value, line item and page reference against the drawings, and confirm in the field as necessary. All pricing shown is suggested budget pricing only: it was generated by computer from the drawings using typical current costs for this kind of work in this region, not from supplier quotes, a cost database or field measurements. Replace it with your own numbers.
What the drawing analysis is for: it builds a template and organizes the work so your estimate goes faster and your proposal is more professional and consistent. It flags details that need special consideration. It is not a substitute for your own review of the drawings and is not a catch-all for quality.
How this works (tap to read)
each of the 11 trade packages is pre-filled from the Scope Scan of the drawings, with sheet references on every line. Pick a package from the menu above. Under Your contract, tick the packages you're taking; the proposal platform fee is figured once on that combined total. Change any field, add or remove scope lines, and your edits save automatically in this browser. Press Generate PDF proposal to see the finished product, log anything that trips you up under Report an issue, and press Submit package when it’s ready. The drawings come separately as a .zip. Dollar amounts are budget placeholders so the whole project has a working total. They assume the Government’s bid schedule quantities at 2026 western North Dakota federal highway rates. Replace them with your pricing.
Prime bids are due to FHWA Central Federal Lands Tuesday, November 3, 2026 at 2:00 PM Mountain, as a sealed paper bid in Lakewood, CO. Bidder: Your company, your mailing address. Questions about the bid go to FHWA at . Questions to FHWA closed October 22. Solicitation 6982AF25B000004, full and open with HUBZone price preference, NAICS 237310, estimated $5 million to $10 million. Completion November 9, 2027; no on-site work before April 28, 2027.
Heads up: the 10,000 CY “Subexcavation (10 feet)” item pays only the excavated volume. Backfill, geogrid, fabric, underdrain, dewatering and shoring all ride in that unit price. See Code & zoning below.
This browser isn’t saving drafts (private window or blocked storage). You can still fill out the form, generate the PDF and submit.